Description

The tender concerns the replacement of an existing wood chip boiler at Cherain School with a new mixed wood chip/pellet biomass boiler system. Beyond the boiler installation itself, the project specifies adaptations to the existing fuel unloading system, suggesting potential mechanical and structural modifications. Bringing systems up to current code implies compliance with recent Belgian regulations for heating systems, potentially including new safety features and emissions standards. The extension of the heating network suggests a need for piping work, insulation, and hydraulic balancing. Given the school setting, adherence to strict schedules and noise restrictions during the work is very likely. The lack of a published contract value suggests this is a smaller-scale procurement, likely subject to standard Belgian public procurement rules.

Original description

This project involves replacing an existing wood chip biomass boiler with a new mixed wood chip/pellet biomass boiler system. Work includes adapting the unloading system, bringing systems up to code, and extending the heating network.

Deutsch

Kesselaustausch in der Schule von Cherain

Dieses Projekt umfasst den Austausch eines bestehenden Biomasse-Hackgutkessels durch ein neues Biomasse-Mischsystem (Hackgut/Pellet). Die Arbeiten umfassen die Anpassung des Entladesystems, die Einhaltung der Vorschriften und die Erweiterung des Heizungsnetzes.

Français

Remplacement de la chaudière à l'école de Cherain

Ce projet consiste à remplacer une chaudière biomasse à plaquettes existante par une nouvelle chaudière biomasse mixte (plaquettes/pellets). Les travaux comprennent l'adaptation du système de déchargement, la mise aux normes des systèmes et l'extension du réseau de chauffage.