Coating and Covering of Influent Pump and Receiving Pit at Wulpen Wastewater Plant
Published 25 March 2026
Location
Wulpen, West Flanders, Belgium
Deadline
22 May 2026
58 days remaining
Suggested bid value
~EUR 150,000
Source
bda
Description
This tender concerns a project at the Wulpen wastewater treatment plant in West Flanders, Belgium. The work involves the coating of both the influent pump pit and the receiving pit. Crucially, the project also requires the provision and installation of closed covers for these two pits. This likely involves fabrication and fitting work, in addition to the surface preparation and application of the coating system. The successful contractor will need experience in working with wastewater treatment infrastructure.
While the exact dimensions of the pits are not specified, the nature of the work suggests a relatively small-scale project. The 'general' trade classification implies a requirement for broad construction expertise rather than a highly specialised field. Given the location and focus on concrete/steel protection and containment, contractors specializing in industrial coatings, tank lining, or water treatment infrastructure are encouraged to investigate the full tender documentation to determine bid suitability. The deadline for submission is May 22nd, 2026, providing approximately two months for bid preparation.
As CPV codes are unavailable, determining the precise nature of the required materials and standards is difficult. Careful examination of the tender documents will be essential to assess compliance requirements for coatings, cover materials, and potential safety certifications.
Original description
This project involves coating the existing influent pump pit and receiving pit at the Wulpen wastewater treatment plant. It also requires providing a closed cover for both pits.
Deutsch
Beschichtung und Abdeckung von Zulaufpumpen- und Aufnahmeschacht in Kläranlage Wulpen
Dieses Projekt umfasst die Beschichtung des bestehenden Zulaufpumpenschachts und Aufnahmeschachts in der Kläranlage Wulpen. Außerdem ist eine geschlossene Abdeckung für beide Schächte erforderlich.
Français
Revêtement et couverture du puits de pompage et du puits de réception des eaux usées à la station d'épuration de Wulpen
Ce projet concerne le revêtement du puits de pompage et du puits de réception des eaux usées existants à la station d'épuration de Wulpen. Il nécessite également la fourniture d'un couvercle fermé pour les deux puits.