Construction of Green Corridor Extension
Published 12 March 2026
Location
Maastricht, Limburg, Netherlands
Deadline
6 May 2026
48 days remaining
Suggested bid value
~EUR 3,500,000
Source
tenderned
Description
The tender concerns an extension of an existing 'Green Corridor' in Maastricht, Limburg, Netherlands. From the description, the practical work involves significant civil engineering, including the construction of a pedestrian and cycle path, likely with associated earthworks and foundation laying. Road diversions and reconstruction suggest modifications to existing roadways to accommodate the new infrastructure. The installation of a new drainage system and public lighting points to underground utility work and electrical installations, respectively. Finally, tree planting infrastructure indicates landscaping elements.
Considering the range of work involved - roadworks, path construction, drainage, and lighting - the project likely involves multiple specialized teams and careful coordination. The presence of road diversions implies potential disruption management challenges and interaction with existing traffic flows. The absence of specific CPV codes makes it difficult to precisely determine which regulations and standards apply but road-related CPV codes will be expected. The tender's location in Maastricht and the comprehensive nature of the project suggest adherence to Dutch public procurement laws. The deadline leaves a reasonable timeframe for preparing a bid.
Original description
This project involves extending the Green Corridor, including constructing a pedestrian and cycle path, road diversions, road reconstruction, drainage system installation, tree planting infrastructure, and new public lighting.
Deutsch
Bau einer Erweiterung des Grünen Korridors
Dieses Projekt umfasst die Erweiterung des Grünen Korridors, einschließlich des Baus eines Fuß- und Radwegs, Straßenumleitungen, Straßensanierung, Installation eines Entwässerungssystems, Baumpflanzinfrastruktur und neue öffentliche Beleuchtung.
Français
Construction d'une extension du corridor vert
Ce projet comprend l'extension du corridor vert, y compris la construction d'un sentier piétonnier et cyclable, des déviations routières, la reconstruction de routes, l'installation d'un système de drainage, l'infrastructure de plantation d'arbres et un nouvel éclairage public.