Demolition and Earthworks for New Hospital Construction
Published 10 March 2026
Location
Bad Nauheim, Hesse, Germany
Deadline
7 May 2026
48 days remaining
Suggested bid value
~EUR 1,800,000
Source
ted
Description
This public tender, published in Hesse, Germany (Bad Nauheim), seeks a contractor to perform demolition and earthworks in preparation for a new hospital construction project. The primary work includes the demolition and dismantling of two existing buildings, totaling approximately 13,200m³ (9300m³ for building 1 and 3900m³ for building 2). Crucially, the project necessitates hazardous material removal, specifically asbestos abatement covering 1050m² of external wall insulation. Excavation work involves removing 14,000m³ of soil, and the construction of a sheet pile wall (Trägerbohlwand) for shoring is required.
The scale of demolition (two buildings and asbestos abatement) and the associated earthworks suggest a medium-sized project requiring specialized equipment and expertise. The presence of asbestos abatement introduces a layer of complexity demanding adherence to strict environmental regulations and safety protocols. The project also includes dewatering (Wasserhaltung).
The deadline for bid submission is May 7th, 2026, providing a limited timeframe for preparing a comprehensive proposal. Given the detailed scope, potential bidders should thoroughly assess their capacity to handle hazardous material removal, excavation volumes, and shoring requirements within the specified timeframe.
Original description
Demolition and dismantling of two existing buildings, including hazardous material removal (asbestos abatement), excavation, and shoring work for a new hospital construction project. Approximately 9300m³ building 1 and 3900m³ building 2 demolition, 14000m³ excavation.
Deutsch
Abbruch- und Erdarbeiten für Krankenhausneubau
Abbruch und Rückbau von zwei bestehenden Gebäuden, einschließlich Schadstoffsanierung (Asbestbeseitigung), Aushub und Verbauarbeiten für ein neues Krankenhausbauprojekt. Ungefähr 9300m³ Gebäude 1 und 3900m³ Gebäude 2 Abbruch, 14000m³ Aushub.
Français
Travaux de démolition et de terrassement pour la construction d'un nouvel hôpital
Démolition et démantèlement de deux bâtiments existants, y compris l'enlèvement des matières dangereuses (désamiantage), les travaux d'excavation et d'étaiement pour un nouveau projet de construction d'hôpital. Démolition d'environ 9300 m³ du bâtiment 1 et de 3900 m³ du bâtiment 2, excavation de 14000 m³.