Demolition Works at Fraunhofer IBP-H Valley, 3rd Construction Phase
Published 8 March 2026
Location
Fraunhofer IBP-H Valley, Germany
Deadline
1 April 2026
13 days remaining
Suggested bid value
~EUR 250,000
Source
bund.de
Description
This German public procurement tender requires contractors to undertake demolition works at the Fraunhofer IBP-H Valley site, specifically as part of the third construction phase. Given the limited information, the exact scope of work is unclear, but it will involve the dismantling and removal of existing structures. This includes any necessary site clearance, waste disposal, and adherence to relevant German regulations concerning demolition, safety, and environmental protection. The location within the Fraunhofer IBP-H Valley suggests a research or institute setting, potentially implying specific sensitivities or requirements regarding noise, vibration, and dust control during the demolition process. The lack of a published contract value and missing CPV codes makes it difficult to fully assess the project's complexity and scale. Contractors should investigate further to determine the type and size of structures to be demolished, site access constraints, and any specific environmental or safety requirements outlined in the full tender documents before deciding whether to bid.
The deadline for submissions is April 1st, 2026, providing a relatively short window for bid preparation. Contractors should also be aware that the absence of a specified region may indicate a very localized procurement, potentially favouring companies already operating in the area. Without more detailed information on the project's scope and specific requirements, it is difficult to assess the level of competition likely to be encountered. However, due to the limited information provided, a cautious approach to resource allocation is advised during the initial evaluation phase.
Original description
Demolition works are required as part of the third construction phase at the Fraunhofer IBP-H Valley site. This project involves demolition work.
Deutsch
Abbrucharbeiten im Fraunhofer IBP-H Valley, 3. Bauabschnitt
Abbrucharbeiten sind im Rahmen der dritten Bauphase im Fraunhofer IBP-H Valley erforderlich. Dieses Projekt umfasst Abbrucharbeiten.
Français
Travaux de démolition à Fraunhofer IBP-H Valley, 3ème phase de construction
Des travaux de démolition sont nécessaires dans le cadre de la troisième phase de construction sur le site de Fraunhofer IBP-H Valley. Ce projet comprend des travaux de démolition.