PL Road/Civil Open

Design and Construction of S12 Expressway, Wieniawa - Radom South Section

Published 9 March 2026

location_on

Location

PL921, Poland

schedule

Deadline

26 March 2026

6 days remaining

auto_awesome

Suggested bid value

~EUR 150,000,000

source

Source

ted

Description

This Polish public procurement tender concerns the design and construction of a section of the S12 expressway, specifically the Wieniawa - Radom South section. The project spans from kilometer marker 29+107 near the Wieniawa junction (excluding the junction itself) to kilometer marker 1+080 at the Radom South junction (including it). The work encompasses all associated infrastructure construction and obtaining all necessary permits. Given the CPV codes, the infrastructure likely includes earthworks, paving, bridge and tunnel construction (if needed), electrical installations, and potentially landscaping and other related works. The deadline for submissions is March 26, 2026. The length of the project appears to be around 28km.

The multitude of CPV codes suggests a broad scope, requiring a consortium or a contractor with diverse in-house capabilities. The inclusion of design as well as construction increases the complexity and risk profile of the project. Contractors should carefully assess their experience in both design and build projects, as well as their ability to navigate Polish regulatory requirements. The reference to environmental decisions indicates the need for environmental compliance and potentially mitigation measures.

Note that the tender documents are in Polish, so bidders will need translation capabilities and Polish speaking technical staff. The requirement to 'design and build' this section of the S12 expressway means the successful contractor will have to complete an infrastructure project of considerable scale and complexity.

Original description

This tender is for the design and construction of the S12 expressway from Wieniawa junction (excluding the junction itself) to Radom South junction (including the junction). The project includes all associated infrastructure and permits.

Deutsch

Planung und Bau der Schnellstraße S12, Abschnitt Wieniawa - Radom Süd

Diese Ausschreibung umfasst die Planung und den Bau der Schnellstraße S12 vom Knotenpunkt Wieniawa (ohne Knotenpunkt selbst) bis zum Knotenpunkt Radom Süd (einschließlich Knotenpunkt). Das Projekt umfasst die gesamte zugehörige Infrastruktur und Genehmigungen.

Français

Conception et construction de la voie rapide S12, section Wieniawa - Radom Sud

Cet appel d'offres concerne la conception et la construction de la voie rapide S12 depuis le nœud de Wieniawa (hors nœud lui-même) jusqu'au nœud de Radom Sud (y compris le nœud). Le projet comprend toutes les infrastructures et permis associés.

Classification

45000000 45100000 45110000 45120000 45200000 45210000 45220000 45230000 45260000 45300000 45310000 45320000 45330000 45340000 45400000 71000000 71313450 71351910 71351914 71354000 71420000 45000000 45100000 45110000 45120000 45200000 45210000 45220000 45230000 45260000 45300000 45310000 45320000 45330000 45340000 45400000 71000000 71313450 71351910 71351914 71354000 71420000