Electrical Power Plant and Distribution System Upgrade at Gando Air Base, Gran Canaria

Published 11 March 2026

location_on

Location

Madrid, Canarias, Spain

schedule

Deadline

8 April 2026

20 days remaining

euro

Estimated value

EUR 11,926,250.02

source

Source

placsp

Description

This Spanish public procurement tender concerns a complete rehabilitation of the electrical power plant and distribution system at Gando Air Base in Gran Canaria. The scope of work includes a comprehensive upgrade of existing electrical infrastructure. Contractors should expect to perform tasks related to power generation, transmission, and distribution, including potential replacement or refurbishment of generators, transformers, switchgear, cabling, and control systems.

With a published value of approximately €11.9 million, this project represents a significant investment in the electrical infrastructure of a critical air base. Given the nature of the location (air base) and the scope of complete rehabilitation, bidders should anticipate stringent security requirements, potentially complex logistical challenges associated with working on an operational military facility, and adherence to specific standards and regulations related to defense infrastructure. The tight deadline of less than one month from publication to bid submission suggests that only companies with readily available resources and prior experience in similar projects will be competitive.

Furthermore, the listing specifies Madrid as the City but the work is in Gran Canaria. This implies the contracting authority is likely located in Madrid, and successful bidders may need to engage with them remotely. Since the CPV codes are unknown, contractors will need to thoroughly investigate the tender documents to determine the precise technical requirements and regulatory framework relevant to the project.

Original description

Complete rehabilitation of the electrical power plant and distribution system at the Gando Air Base in Gran Canaria, Canary Islands. This project involves a comprehensive upgrade of existing infrastructure.

Deutsch

Modernisierung des Elektrizitätswerks und des Verteilungssystems auf dem Luftwaffenstützpunkt Gando, Gran Canaria

Umfassende Sanierung des Elektrizitätswerks und des Verteilungssystems auf dem Luftwaffenstützpunkt Gando auf Gran Canaria, Kanarische Inseln. Dieses Projekt umfasst eine umfassende Modernisierung der bestehenden Infrastruktur.

Français

Modernisation de la centrale électrique et du système de distribution de la base aérienne de Gando, Gran Canaria

Réhabilitation complète de la centrale électrique et du système de distribution de la base aérienne de Gando, à Gran Canaria, aux îles Canaries. Ce projet comprend une modernisation complète de l'infrastructure existante.

info

Spain's PLACSP portal may require a Spanish digital certificate (certificado electrónico) to view tender details. The link above takes you to the public search page where you can look up this tender by its reference number: 2025/EA02/00002139E.

Related tenders

ES electrical

Installation of Solar Photovoltaic System for Energy Community

This tender is for the installation of a solar photovoltaic system for collective self-consumption by the Membrío energy community. The project is located in Membrío, Extremadura.

place Membrío, Extremadura

schedule 8 Apr

ES electrical

Photovoltaic Installation at Cruz Chiquita Nursery

Installation of a photovoltaic (solar panel) system at the Cruz Chiquita Nursery. The project is located in San Sebastián de La Gomera.

place San Sebastián de La Gomera, Canary Islands

schedule 26 Mar

ES electrical

New Efficient Lighting Installation for Port Area

Installation of new, energy-efficient lighting in the maritime zone of the Mineral Loading Dock at the Port. The project involves electrical work.

place Melilla, Melilla

schedule 14 Apr

ES electrical

Electrical Installation for Laundry Equipment at Ibiza Parador

Installation of a new electrical connection and protection panels for laundry equipment at the Parador de Turismo in Ibiza. This project requires electrical work.

place Madrid, Madrid

schedule 26 Mar

ES electrical

Power Upgrade at Substation for Desalination Plant

This project involves upgrading the power capacity at a substation (Abonado 3215) that serves the Mogán desalination plant. The work will take place in Mogán.

place Mogán, Canary Islands

schedule 10 Apr

ES electrical

Fire Alarm System Upgrade at Justice Center

This project involves upgrading the central fire alarm system at the Justice Center. Contractors are needed to migrate and update the existing system.

place Zaragoza, Aragon

schedule 6 Apr