FR HVAC Open

Geothermal Works for Jean Capelle Amphitheater Renovation at INSA Lyon

Published 12 March 2026

location_on

Location

Lyon, Auvergne-Rhone-Alpes, France

schedule

Deadline

7 April 2026

19 days remaining

auto_awesome

Suggested bid value

~EUR 750,000

source

Source

boamp

Description

This French public procurement tender concerns the installation of a geothermal heating and cooling system for the Jean Capelle Amphitheater renovation at INSA Lyon. The project, located in the Auvergne-Rhone-Alpes region, specifically targets HVAC contractors. The work will involve drilling boreholes, installing ground source heat pumps, connecting to the amphitheater's existing HVAC infrastructure, and commissioning the complete geothermal system. Given the location within a university campus and the fact it's a renovation project, expect potential challenges related to site access, noise restrictions during drilling, and integration with existing building systems.

The project's complexity will likely depend on the size and specific heating/cooling demands of the amphitheater, which is not detailed in the tender announcement. The absence of CPV codes makes it difficult to assess the specifics of the required expertise. Contractors should consider that the deadline is approximately three weeks from the publication date, leaving a relatively short window for bid preparation. The lack of published contract value suggests a need for careful cost estimation and risk assessment during the tendering process.

Original description

This tender is for geothermal system installation as part of the Jean Capelle Amphitheater renovation project at INSA Lyon. The work involves installing a geothermal heating and cooling system.

Deutsch

Geothermiearbeiten für die Renovierung des Jean Capelle Amphitheaters am INSA Lyon

Diese Ausschreibung betrifft die Installation eines Geothermiesystems im Rahmen der Renovierung des Jean Capelle Amphitheaters am INSA Lyon. Die Arbeiten umfassen die Installation eines geothermischen Heiz- und Kühlsystems.

Français

Travaux de géothermie pour la rénovation de l'amphithéâtre Jean Capelle à l'INSA Lyon

Cet appel d'offres concerne l'installation d'un système géothermique dans le cadre du projet de rénovation de l'amphithéâtre Jean Capelle à l'INSA Lyon. Les travaux consistent à installer un système de chauffage et de refroidissement géothermique.

Related tenders

FR hvac

Heating and Hot Water System Refurbishment at Paul Verlaine College

This tender is for the refurbishment of the heating and domestic hot water production systems in the boiler room at Paul Verlaine College. The project involves general construction work.

place Bethune, Hauts-de-France

schedule 9 Apr

FR hvac

Air Handling Unit Replacement at Cremetterie School, Saint-Herblain

This tender is for the replacement of air handling units (AHUs) at the Cremetterie school. The project is located in Saint-Herblain, France.

place Saint-Herblain, Pays de la Loire

schedule 10 Apr

FR hvac

HVAC System Upgrade at Lycee Fresnel, Normandy

This tender is for the restructuring of the heating installations at Lycee Augustin Fresnel in Caen. Contractors are invited to bid on Lot 5.

place Caen, Normandie

schedule 15 Apr

FR hvac

Operation of Heating and Hot Water Systems for Residential Buildings

This tender is for the operation and maintenance of collective heating and domestic hot water systems in residential buildings. The work covers the overall management of these installations.

place Amiens, Hauts-de-France

schedule 28 Apr

FR hvac

Boiler Room Renovation for Greenhouses at INRAE PACA - Sophia Antipolis

This tender is for the renovation of the boiler room that serves the greenhouses at the INRAE PACA research center. The site is located in Sophia Antipolis.

place Sophia Antipolis, Provence-Alpes-Cote d'Azur

schedule 14 Apr

FR hvac

HVAC System Renovation at Parcs d'Azur Headquarters, Palmeira

This tender is for the renovation of the HVAC (Heating, Ventilation, and Air Conditioning) systems at the Parcs d'Azur headquarters located on the Palmeira site. The project involves general construction work related to the HVAC upgrades.

place Provence-Alpes-Cote d'Azur

schedule 7 Apr