Installation of Electric Vehicle Charging Points
Published 10 March 2026
Location
Santoña, Cantabria, Spain
Deadline
26 March 2026
7 days remaining
Estimated value
EUR 36,707.44
Source
placsp
Description
This tender, originating from Santoña, Cantabria (Spain), concerns the installation of two dual electric vehicle charging stations. The project is part of a broader Tourism Sustainability Plan and is financed by the EU's Next Generation EU program. This indicates that compliance with EU funding regulations may be required as part of the tender.
The project's electrical trade focus implies a need for qualified electricians and adherence to Spanish electrical safety standards. The budget is approximately €36,707.44, which suggests a relatively small-scale project, likely involving standard AC charging units rather than more complex high-power DC fast chargers. Given the deadline of March 26, 2026, only 16 days after publication, contractors need to act swiftly to prepare a bid.
Contractors should assess their existing workload and resource availability to determine their capacity to meet the short turnaround time. Furthermore, due diligence is recommended to confirm the required charging station specifications, grid connection details, and any specific regional certifications. Missing CPV codes mean contractors will have to research the relevant codes themselves and determine if this aligns with their core business.
Original description
This project involves the installation of two dual electric vehicle charging stations. It is part of the Tourism Sustainability Plan funded by the European Union's Next Generation EU program.
Deutsch
Installation von Ladestationen für Elektrofahrzeuge
Dieses Projekt umfasst die Installation von zwei dualen Ladestationen für Elektrofahrzeuge. Es ist Teil des Plans für touristische Nachhaltigkeit, der von der Europäischen Union - NEXT GENERATION EU finanziert wird.
Français
Installation de bornes de recharge pour véhicules électriques
Ce projet comprend l'installation de deux bornes de recharge doubles pour véhicules électriques. Il s'inscrit dans le cadre du Plan de Soutenabilité Touristique financé par le programme Next Generation EU de l'Union Européenne.
Spain's PLACSP portal may require a Spanish digital certificate (certificado electrónico) to view tender details. The link above takes you to the public search page where you can look up this tender by its reference number: 2026/356.