Non-hazardous waste landfill closure works
Published 17 February 2026
Location
Cormons, Nord-Est, Italy
Deadline
23 February 2026
Deadline passed
Estimated value
EUR 3,894,906.68
Source
ted
Description
This open tender concerns the execution of closure and remediation works at a non-hazardous waste landfill site located in Cormons, in the Nord-Est region of Italy. The project scope encompasses all necessary work to achieve regulatory compliance under an integrated environmental authorization (AIA), specifically Decree N. 31127/GRFVG of 19.12.2022. From the CPV codes (45222110 - Construction work for waste disposal plants, 90530000 - Operation of a refuse tip), the work will likely involve earthworks, capping, leachate management, gas management systems, and other environmental protection measures typically associated with landfill closure. The AIA requirement suggests stringent environmental performance criteria.
The project has a published value of approximately EUR 3.89 million. The short bidding window (publication date of 2026-02-17, deadline 2026-02-23) indicates a fast-paced procurement process and requires rapid preparation of the bid documentation. Contractors should assess their capacity to mobilize resources and prepare a compliant tender within this timeframe, paying close attention to the specific technical and environmental requirements outlined in the full tender documents.
Original description
Open tender for the execution of closure and remediation works at a non-hazardous waste landfill site. The project includes environmental compliance measures required under integrated environmental authorization.
Deutsch
Schließungsarbeiten einer Deponie für nicht gefährliche Abfälle
Offenes Ausschreibungsverfahren für die Durchführung von Schließungs- und Sanierungsarbeiten auf einer Deponie für nicht gefährliche Abfälle. Das Projekt umfasst Umweltschutzmaßnahmen gemäß der integrierten Umweltgenehmigung.
Français
Travaux de fermeture de décharge pour déchets non dangereux
Appel d'offres ouvert pour l'exécution des travaux de fermeture et de remise en état d'un site de décharge pour déchets non dangereux. Le projet comprend des mesures de conformité environnementale requises en vertu d'une autorisation environnementale intégrée.