Pörzberg Tunnel B 90 - Adaptation Lighting Renewal
Published 23 March 2026
Location
Freistaat Thüringen, Landkreis Saalfeld-Rudolstadt, Germany
Deadline
16 April 2026
24 days remaining
Suggested bid value
~EUR 450,000
Source
bund.de
Description
This German public works tender concerns the replacement of existing adaptation lighting systems within the Pörzberg Tunnel, located on the B 90 highway in Landkreis Saalfeld-Rudolstadt, Freistaat Thüringen. The core activity will likely involve the physical removal of the existing tunnel lighting infrastructure and the installation of modern LED or similar technology. Contractors should anticipate tasks such as cable laying, connection to the electrical grid, mounting of lighting fixtures, and disposal of old equipment. The absence of CPV codes and a published contract value makes assessing the precise technological requirements challenging at this stage. Given the location within a tunnel, contractors should anticipate specific safety requirements, confined space working conditions, and potential traffic management considerations. The deadline for submissions is 2026-04-16.
Original description
This project involves the renewal of adaptation lighting within the Pörzberg Tunnel on the B 90 highway. The work will likely include removing old lighting and installing new, updated systems.
Deutsch
B 90 Tunnel Pörzberg - Erneuerung der Adaptionsbeleuchtung
Dieses Projekt umfasst die Erneuerung der Adaptionsbeleuchtung im Pörzberg Tunnel auf der B 90. Die Arbeiten umfassen wahrscheinlich die Entfernung der alten Beleuchtung und die Installation neuer, aktualisierter Systeme.
Français
Tunnel Pörzberg B 90 - Rénovation de l'éclairage d'adaptation
Ce projet concerne le renouvellement de l'éclairage d'adaptation dans le tunnel de Pörzberg sur la route B 90. Les travaux comprendront probablement le retrait de l'ancien éclairage et l'installation de nouveaux systèmes mis à jour.